PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Fixed low roof curbs Facing East.jpg Installing ductwork at the 4th floor Facing West.jpg Layout 2 courses of block around the perimeter of the 2nd floor roof Facing South.jpg Low roof storm piping at the 4th floor Facing West.jpg Started the 3rd floor interior metal framing Facing West.jpg Erecting the stone panels at the East Elevation 5.jpg Erecting the stone panels at the East Elevation 6.jpg Split wire above the ceiling at the 2nd floor Facing South.jpg
Previous pageNext page Started the 3rd floor interior metal framing Facing West
Started the 3rd floor interior metal framing Facing West